PROJECT CASE STUDY · LAS VEGAS, NV

Restroom Wall Renovation in Las Vegas

The lower wall opened to the studs, new drywall and paint, and a clean finished restroom.

Call (702) 420-2836Get a Free Estimate
LocationLas Vegas, NV
ProjectRestroom renovation
Typical timeline4 to 7 working daysPlanning estimate for similar Las Vegas projects in 2026, not the exact price of this job.
Typical cost range$2,500 to $6,500Planning estimate for similar Las Vegas projects in 2026, not the exact price of this job.
THE PROJECT

Opening the wall and finishing the room

This restroom job began with the lower wall opened down to the studs. Our crew worked on the framing and insulation, closed the wall with new drywall and finished the room with paint and flooring.

Walls are often opened for water leaks, moisture, outdated finishes or repairs behind the wall. Whatever the reason, the goal is the same: a clean, solid wall and a room you can use again.

Scope shown in the photos

  • Lower wall opened to the studs
  • Framing and R-11 insulation work
  • New drywall
  • Painted two-tone wall
  • Plank-style flooring
  • Finished restroom with grab bar and wall-mounted sink
1
BEFORE

What the wall looked like

With the lower wall removed, the framing and R-11 batt insulation were exposed along the wall.

Restroom wall opened to the studs with R-11 insulation during renovationBefore
Restroom wall framing and insulation exposed during renovationBefore
Restroom wall opened to the studs with insulation and a paint can on the floorBefore
2
DURING

The work in progress

The crew worked inside the open wall, handled insulation and debris, and prepared the space for new drywall. Workers wore masks and gloves.

Worker in a mask kneeling beside exposed wall insulation during a restroom renovationIn progress
Worker in a respirator inside a restroom with the lower wall removedIn progress
New drywall on a restroom wall during renovationNew drywall
3
AFTER

The finished restroom

The finished room has a painted two-tone wall, plank-style flooring, a wall-mounted sink and a grab bar.

Finished restroom with grab bar, wall-mounted sink and new plank flooringAfter
QUESTIONS

Common questions

How long does a wall repair like this take?

A project like this often takes about 4 to 7 working days, depending on how much of the wall is opened, drying or repair needs, and finishing. This is a planning range, not a promise for your job.

Do I need a permit to open and rebuild a wall?

It depends on the scope. Plumbing, electrical or structural work usually needs a permit. We confirm the requirements with your city or Clark County before work starts.

Why would a restroom wall be opened?

Common reasons include water leaks, moisture, old or damaged finishes, and repairs to plumbing or wiring behind the wall.

How much does a restroom wall renovation cost?

Small restroom wall repairs often fall in the range of about $2,500 to $6,500 in Las Vegas in 2026. Your written estimate depends on size, materials and what we find behind the wall.

MORE PROJECTS

See more of our work

FREE ESTIMATE

Ready to Start Your Project?

Tell us what you have in mind. We visit, explain your options in plain words and give you a written estimate.

Call (702) 420-2836Request a Free Estimate
Licensed and insured in NevadaLicense #0096101Written estimatesServing Las Vegas and Clark County